Re: Mechanical Engineer Position (maintenance and projects)
Please consider my application in regards to the open Mechanical Engineer position at your Company. I am encouraged at the prospect of this position due to the potential match of my qualifications and lifelong desire to work at your company. My qualifications and experience are closely aligned to the requirements of this position.
I am a Mechanical Engineer with 4+ years of experience. My goal is to obtain an engineering position with your company as a Mechanical Engineer. I have a diverse engineering background with valuable experience in mechanical machinery maintenance and projects handling.
Based on the skills requirements of the position, you have a need for in-depth mechanical maintenance and projects handling experience. I currently work for RNZ INTERNATIONAL FZE as a Mechanical Engineer in the Heavy Machine Unit where I have been unit mechanical head from last May. My work have been included in several types of companies like chemical, pharma, granulation, bio starch, bio tech, Acid plant, SSP, NPK, DCP, fertilizers and pesticides machinery. As you review my resume, you will see that I have steadily progressed in my engineering career at Machinery handling. Within my journey, I was promoted from graduate trainee to my current position. If selected for an interview, I can also provide review documentation that provides information on my competency ratings. Aside from my technical achievements, I have been consistently rated “Above Expectations” in my teamwork, interpersonal, and communications competencies.
My educational background provides a solid engineering foundation and meets credential requirements of the position. I possess a Master of Technology in Mechanical Engineering (CAD/CAM) from the University of JNTU Kakinada and a Bachelor of Technology in Mechanical Engineering from JNTUK, earned in 2013
Working as mechanical unit head
Expansion of 150 tons/day starch plant to 250 tons in 3 months without stoppage of plant.
Restarted the 15 tons boiler which is stopped nearly 2 years back.
Maintaining the 15 ton boiler which is commenced 20 years back.
A new 1 ton/hour fiber dryer designed in the unit, commenced and put in running. It helps the institution to save almost 22 lakhs per month.
I tried my level best and satisfied the new management in regaining sick industry in to with a profitable margin company.
Achieved the target to minimize the break down time given by the unit head.
Minimized the monthly mechanical spares budget from month to month.
Maintained over 60 reactors, 300 pumps, 60 heat exchangers and etc. With my maintenance team.
I was given as chief of construction engineer for new plant (NPK) in Salem and Aurangabad plants. Complete estimations for the regarding plant and fabrication dimensions are prepared by me.
“Design, process and estimation for dust cleaning machine suitable to Indian roads” is being published by me in IJESR: ISSN: 2347-6532. And a sample is prepared by me, which shows its highest efficiency in working in cleaning dusts on roads.
A complete plant design estimation and erection done by me for chemical plant named “LABSA” (LINEAR ALKYL BENZINE SULPHONIC ACID).
Maintained an ISO certified (with IMS) company for 2 year without any ISO obligation, complete ISO quality management system(QMS) 9001:2008, ISO environmental management system (EMS) 14001:2004 and occupational, health and safety assessment system (OHSAS) 18001:2007.